Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Overview, instrument cluster with enhanced features
    1. Messages, e.g. Check Control Time Date 2. Range 3. Computer 4. Navigation display Service requirements Miles/trip miles 5. Selection list, for instance radio Current fuel consumpti ...

    Stowing cargo
    ▷ Heavy cargo: stow as far forward and as low as possible, ideally directly behind the cargo area separating wall. ▷ Very heavy cargo: when the rear seat is not occupied, secure e ...

    Damage to safety belts
    In the case of strain caused by accidents or damage: Have the safety belts, including the safety belt tensioners, replaced and have the belt anchors checked. Checking and replacing safety b ...