Initialization after a power failure
After a power failure, it is only possible to raise the roof, if necessary.
Have the system initialized by your service center.
See also:
At a glance
1. Rear fog lamps
2. Front fog lamps
3. Automatic headlamp control, Adaptive Light
Control , High-beam Assistant, Welcome
lamps, daytime running lights
4. Lamps off, daytime running lights
5. ...
Volume of spoken instructions
Turn the volume button while giving an instruction
until the desired volume is set.
The setting is stored for the remote control currently
in use. ...
Changing, maintaining, and storing the
speed
The rocker switch can be pressed while the system
is interrupted to maintain and store the current
speed. DSC Dynamic Stability Control is
switched on, if necessary.
Adapting the desired speed ...
