Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Overview, instrument cluster
    Overview, instrument cluster 1 Messages, e.g. Check Control     Time     Date     External temperature     Selection lists  & ...

    View of an opened menu
    When a menu is opened, it generally opens with the panel that was last selected in that menu. To display the first panel of a menu: ▷ Move the controller to the left repeatedly until the ...

    Vehicle equipment
    All standard, country-specific and optional equipment that is offered in the model series is described in this chapter. Therefore, equipment is also described that is not available in a vehicle, e ...