Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Split screen
    General information Additional information can be displayed on the right side of the split screen, e.g., information from the onboard computer. In the divided screen view, the so-called split s ...

    Features
    Like most up-level BMWs these days, the 650i can be equipped with a dizzying array of technological wizardry. Ours came equipped with an optional lane departure warning and correction system, adap ...

    Contacts
    At a glance Contacts can be created and edited. The contacts from the mobile phone* are displayed as well if this function is supported by the mobile phone. Addresses can be adopted as destinat ...