Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Entering a street and intersection
    1. Select "Street" or the displayed street. 2. Enter a street and intersection in the sameway as you would enter a town/city. If there are several streets with the same name: 1. Change ...

    The concept
    The Check Control system monitors functions in the vehicle and notifies you of malfunctions in the monitored systems. A Check Control message is displayed as a combination of indicator or warni ...

    Storage periods
    Storage periods during which the vehicle battery was disconnected are not taken into account. If this occurs, have a service center update the time-dependent maintenance procedures, such as che ...