Initialization after a power failure
After a power failure, it is only possible to raise the roof, if necessary.
Have the system initialized by your service center.
See also:
Freeze frame
1. Press the
button on the remote control
during playback.
Freeze frame
2. Select the symbol.
3. Press
the button.
To continue playback:
1. Select the
symbol.
2. Press th ...
Overview, instrument cluster
1. Miles/trip miles
External temperature
Time
Date
Range
Selection list, e.g., radio
Navigation display
Computer
2. Transmission display
Current fuel consumption
Energy recovery
3. ...
Checking the address as a destination
An address that is to be used for destination
guidance must match the navigation data contained
in the vehicle. The address can be
checked for this purpose.
1. Select the desired contact and hi ...
