Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Office information
    The number of unread messages and active tasks as well as the upcoming appointments are displayed. 1. "Office" 2. "Current office" 3. Select the desired entry to display det ...

    Vehicle equipment
    All standard, country-specific and optional equipment that is offered in the model series is described in this chapter. Therefore, equipment is also described that is not available in a vehicle, ...

    Activating/deactivating the systemmanually
    Using the button Press the button. ► LED comes on: Auto Start Stop function is deactivated. The engine is started during an automatic engine stop. The engine can only be stopped or ...