Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Fold-out position of the wipers
    Fold-out position of the wipers Required when changing the wiper blades or under frosty conditions, for example. 1. Switch off the ignition. 2. Under frosty conditions, ensure that the wiper bl ...

    Radio Data System RDS
    In the FM waveband, additional information is transmitted via RDS. If the reception conditions are good, the station names are shown on the Control Display. Where reception is poor or in the event ...

    Integrated Owner's Manual inthe vehicle
    The integrated Owner's Manual can be displayed on the Control Display. The equipment and functions that are in the vehicle are described therein. ...