Initialization after a power failure
After a power failure, it is only possible to raise the roof, if necessary.
Have the system initialized by your service center.
See also:
Tilting the glass sunroof
Push switch upward briefly.
The closed roof is tilted and
the sliding visor opens
slightly.
The opened roof closes until
it is in its tilted position. The sliding visor stays complete ...
Indicator/warning lamps
The indicator lamp flashes: DSC
controls
the drive forces and brake forces.
The indicator lamp lights up: DSC has
failed. ...
Units of measure
Setting the units of measure
To set the units for fuel consumption, route/distance
and temperature:
1. "Settings"
2. "Language/Units"
3. Select the desired menu item.
4. S ...
