Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Overview, instrument cluster with enhanced features
    Overview, instrument cluster with enhanced features 1 Time     External temperature     Date     Selection list, e.g., radio     Sp ...

    Headlamp courtesy delay feature
    The low beams stay lit for a short while if the headlamp flasher is switched on after the ignition is switched off. Setting the duration 1. "Settings" 2. "Lighting" 3. &quo ...

    Leafing through the Owner's Manual
    Page by page with link access Turn the controller until the next or previous page is displayed. Page by page without link access Leaf through the pages directly while skipping the links. Highl ...