Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Playing music
    Music search All tracks for which additional information has been stored can be accessed by the music search. Tracks without additional information can be called up via the corresponding album ...

    Malfunction
    The yellow warning lamp flashes and then lights up continuously. A Check Control message is displayed. No flat tire can be detected. Display in the following situations: ▷ A wheel wit ...

    BMW 328i: new four-cylinder petrol engine with TwinPower Turbo technology sets a new benchmark for driving dynamics and efficiency
    With the launch of the new sports sedan, a brand-new four-cylinder engine will make its debut in the BMW 3-Series. In keeping with the dynamic overall theme of the new BMW sports sedan, this new-g ...