Initialization after a power failure
After a power failure, it is only possible to raise the roof, if necessary.
Have the system initialized by your service center.
See also:
Mounting LATCH child restraint fixing systems
1. Mount the child restraint fixing system; refer
to the operating instructions of the system.
2. Ensure that both LATCH anchors are properly
connected. ...
Making settings for DVD
1.
Press
the button during playback.
Making settings for DVD
2. Make the settings with the remote control:
▷ "Video settings":
▷ "Brightness", "Col ...
Requirements
▷ The mobile phone is suitable.
▷ The mobile phone is ready for operation.
▷ Bluetooth is activated in the vehicle, and on the mobile phone.
▷ Bluetooth presettings may need ...
