Initialization after a power failure
After a power failure, it is only possible to raise the roof, if necessary.
Have the system initialized by your service center.
See also:
At a glance
Display the traffic bulletins from radio stations
that broadcast the TI Traffic Information
of a traffic information service. Information
on traffic obstructions and hazards is
updated ...
Switching on/off directly
1. "Settings"
2. "Climate"
3. "Activate parked-car vent."
The symbol on the automatic
climate control
flashes if the system is switched on. ...
The concept
The system does not measure the actual inflation
pressure in the tires.
It detects a pressure loss in a tire by comparing
the rotational speeds of the individual wheels
while moving.
In the ev ...
