Initialization after a power failure
After a power failure, it is only possible to raise the roof, if necessary.
Have the system initialized by your service center.
See also:
Adjusting manually
Forward/backward
Forward/backward
Pull the lever and slide the seat into the desired
position. After releasing the lever, move the seat
forward or back slightly to make sure it engages
prope ...
Switching the split screen on and off
1.
Press the button.
2. "Split screen" ...
Managing music
Albums
Renaming an album
The name of the album, if available, is automatically
entered when the album is stored. If the
name is not available, it can be changed later if
desired.
1. "CD/ ...
