Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Supplementary text messages
    Addition information, such as on the cause of a fault or the required action, can be called up via Check Control. The supplementary text of urgent messages is displayed on the Control Display a ...

    Maintaining/storing the speed
    Press the button. or: Press the rocker switch while the system is interrupted. When the system is switched on, the current speed is maintained and stored as the desired speed. It is d ...

    Planning a trip with intermediate destinations
    New tripA trip can be planned using intermediate destinations. 1.  "Navigation" 2.  "Map" 3.  Move the controller to the left, if necessary. 4.  "Guid ...