Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    At a glance
    At a glance 1 Function bar 2 Route section with traffic obstruction 3 Traffic sign for traffic obstruction 4 Planned route 5 Current location 6 Upper status field 7 Lower status field Lines ...

    Entertainment
    Operation of the radio, CD equipment and external audio devices as well as their tone settings are described in this chapter. ...

    Mounts for the lower LATCH anchors
    Correctly engage the lower LATCH anchors Make sure that the lower LATCH anchors have properly engaged and that the child restraint fixing system is resting snugly against the backrest; otherw ...