Initialization after a power failure
After a power failure, it is only possible to raise the roof, if necessary.
Have the system initialized by your service center.
See also:
Supplementary text messages
Addition information, such as on the cause of a
fault or the required action, can be called up via
Check Control.
The supplementary text of urgent messages is
displayed on the Control Display a ...
Maintaining/storing the speed
Press the button.
or:
Press the rocker switch while the system is interrupted.
When the system is switched on, the current
speed is maintained and stored as the desired
speed.
It is d ...
Planning a trip with intermediate destinations
New tripA trip can be planned using intermediate destinations.
1. "Navigation"
2. "Map"
3. Move the controller to the left, if necessary.
4. "Guid ...
