Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    For Canadian customers
    Canadian customers who wish to report a safety- related defect to Transport Canada, Defect Investigations and Recalls, may telephone the toll-free hotline 1-800-333-0510. You can also obtain o ...

    Controls
    Before operation Before operating a system using the integrated universal remote control, ensure that there are no people, animals, or objects within the range of movement of the remote-contro ...

    Decreasing speed
    Repeatedly pull the lever to the resistance point or beyond, arrow 2, until the desired speed is displayed. ▷ Each time the lever is pulled to the resistance point, the desired speed is d ...