Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Opening
    1. Unlock the belt lock of the center safety belt in the rear using the latch plate of another safety belt. 2. Insert the latch plate at the end of the belt into the specially designated fixtur ...

    Pinch protection
    If the closing force exceeds a specific value as a window closes, the closing action is interrupted. The window reopens slightly. Danger of pinching even with pinch protection Even with the pin ...

    The concept
    When the low beams are switched on, this system automatically switches the high beams on and off or suppresses the light in the areas that blind oncoming traffic. The procedure is controlled b ...