Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Supplementary text messages
    Addition information, such as on the cause of a fault or the required action, can be called up via Check Control. The supplementary text of urgent messages is displayed automatically. It is sh ...

    Planning a trip with intermediate destinations
    New trip A trip can be planned with several intermediate destinations. 1. "Navigation" 2. "Map" 3. Move the controller to the left if necessary. 4. "Guidance" 5. ...

    Observe the following when refueling
    The fuel tank is full when the filler nozzle clicks off the first time. Handling fuels Obey safety regulations posted at the gas station. ...