Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Map view for split screen
    The map view can be selected for the split screen independently from the main screen. 1. Open "Options". 2. "Split screen" 3. Move the controller to the right repeatedly unt ...

    External temperature
    External temperature warning If the display drops to +37 ℉/ +3 ℃, a signal sounds. A Check Control message is displayed. There is the increased danger of ice. Ice on roads Even ...

    General malfunctions
    ▷ CD/DVD changers and players have been optimized for performance in vehicles. In some instances they may be more sensitive to faulty CDs/DVDs than stationary devices would be. ▷ ...