Initialization after a power failure
After a power failure, it is only possible to raise the roof, if necessary.
Have the system initialized by your service center.
See also:
Storing stations
Via iDrive1. "Radio"
2. "FM" or "AM"
3. Select the desired station.
4. Press the controller for an extended period.
5. Select the desi ...
Controller
Select menu items and create settings.
1. Turn.
2. Press.
3. Move in four directions.
Buttons on controller
...
Displays in the instrument cluster
Displays in the instrument cluster
The gear position is displayed and the engaged
gear, such as M4, is displayed in manual mode. ...
