Initialization after a power failure

After a power failure, it is only possible to raise the roof, if necessary.

Have the system initialized by your service center.

    See also:

    Floor net
    The floor net can also be used to Secure the load and to store small parts. Floor net Hook the floor net into the fittings in the cargo area floor. ...

    2013 BMW 6 Series Gran Coupe: First Look
    Competes with: Mercedes-Benz CLS-Class, Audi A7 Looks like: A more animated 5 Series ... with a 7 Series price tag Drivetrain: 315-hp, twin-turbocharged 3.0-liter inline-six-cylinder; 445-hp, tw ...

    Maximum cooling
    Press the button. The system is set to the lowest temperature, maximum air volume and recirculated-air mode. Air flows out of the vents for the upper body region. Open them for this purpose. ...